Home > News
On October 29, 2026, HNYT loaded and dispatched a batch of 2.5 ton battery mine locomotives for a mining customer in South America. The loco......
In October 2026, HNYT completed the final check, crane loading and transport securing of one 2 ton mining diesel tricycle ordered by an over......
On 10 October 2026, HNYT shipped two 2.5 ton battery mine locomotives and two 15 kW underground mining ventilation fans to Africa. The consi......
On September 14, 2026, HNYT shipped two 2.5 ton mining electric locomotive , one 5 ton mining electric locomotive and a batch of spare parts......
A batch of 22 kW mining rake winch has completed factory testing, packing and loading for shipment to a metal mine in South America. The equ......
As a custom mining locomotive manufacturer, we have completed factory testing and shipment of a batch of 2.5-ton lithium battery locomotives......